home *** CD-ROM | disk | FTP | other *** search
/ Space Shuttle / Space Shuttle.iso / spcshttl / text / m6 < prev    next >
Text File  |  1993-06-22  |  2KB  |  15 lines

  1.  
  2.  
  3. STS-6  Challenger!
  4. The primary payload for this mission was the first Tracking and Data Relay Satellite.  The satellite was deployed into an improper but stable orbit, due to a malfunction in the transfer stage.  It was gradually placed into proper orbit using its propulsion system.  The first space walk of the Shuttle program was successfully performed, as were various payload experiments.!
  5. Sitting, left to right: Commander Paul Weitz, DOB: 7/25/32, Background: Capt., USN. Selected by NASA in 1966. Served as pilot on Skylab 2. Education: M.S. in aeronautical engineering.
  6.     Pilot Karol Bobko, DOB: 12/23/37, Background: Col., USAF. Selected by NASA in 1969. Commander on 51-D and 51-J. Education: B.S. degree; M.S. in aerospace engineering.
  7.     Standing, left to right: Mission Specialist Donald Peterson, DOB:10/22/33, Background: Col., USAF. Worked for NASA in engineering support, man/machine interface and safety assessments. Education: M.S. in nuclear engineering.
  8.     Mission Specialist Story Musgrave, DOB: 8/19/35, Background: Selected by NASA in 1967. Flew as mission specialist on STS-6, 51-F, STS-33 and STS-44. Education: B.S. in mathematics and statistics; B.S. in chemistry; M.A. in literature; M.S. in physiology and biophysics; M.B.A.in operational analysis and computer programming; doctorate of medicine.!
  9. 4 April 1983        1:30 p.m. EST
  10.  
  11. Launch was originally set for 20 January but was postponed when a hydrogen leak into the number one main engine aft compartment was discovered.  Repairs were made and testing done to reach a final countdown.!
  12. 9 April 1983        10:53 a.m. PST
  13. at Edwards AFB, CA
  14.  
  15. Mission Duration: 5 days, 0 hours, 23 minutes, 42 seconds. Completed 80 orbits.!